            Pengawasan Dewan Komisaris Dalam Perumusan dan Implementasi Strategi Perusahaan
            Board of Commissioners Supervision in the Formulation and Implementation of Company Strategy

            Dewan Komisaris, Direksi dan segenap jajaran PLN Indonesia Power   The  Board of Commissioners, Board of  Directors  and all  PLN
            telah merespon tantangan yang dihadapi sepanjang tahun 2022   Indonesia Power  personnel  have properly responded  to the
            dengan baik. Dewan Komisaris memandang bahwa Direksi mampu   challenge faced throughout 2022. The  Board  of  Commissioners
            menerjemahkan tantangan dan kendala yang dihadapi sepanjang   views that the Board of Directors was able to translate the
            tahun 2022 dengan strategi, kebijakan, maupun program inisiatif   challenges and constraints faced throughout 2022 with the right
            yang tepat dan mampu mendorong perbaikan sekaligus peningkatan   strategies, policies, and program initiatives, while also capable of
            kinerja Perusahaan. Dewan Komisaris juga terlibat langsung dalam   promoting improvements to the Company's performance.  The
            pengawasan pelaksanaan target RKAP 2022 dan RJPP, mulai dari   Board of Commissioners was also directly involved in supervising
            tahap perumusan hingga implementasi strategi dan kebijakan PLN   the WP&B 2022 and RJPP targets, starting from the formulation to
            Indonesia Power.                                   the implementation of strategies and policies.


            Dewan Komisaris mendukung segenap upaya, kebijakan maupun   The Board of Commissioners supports all efforts, policies, and
            strategi yang dijalankan oleh Direksi PLN Indonesia Power dalam   strategies implemented by PLN Indonesia Power's Board of Directors
            mencapai target karbon netral atau Net Zero Emission (NZE) di   in achieving carbon neutral or Net Zero Emission (NZE) target by
            tahun 2060. Strategi dan langkah PLN Indonesia Power dalam   2060. PLN  Indonesia  Power's  strategy  and actions  in the energy
            transisi energi tersebut sejalan dengan percepatan pengembangan   transition are in line with the accelerated development of New and
            pembangkit Energi Baru Terbarukan (EBT) yang terus ditingkatkan   Renewable Energy (NRE) power plants whose achievements continue
            pencapaiannya. Dewan Komisaris mengapresiasi kebijakan dan   to be improved. The Board of Commissioners appreciates the policies
            strategi yang dijalankan Direksi, walaupun di tengah berbagai   and strategies implemented by the Board of Directors. Even though in
            kendala dan tantangan yang dihadapi, PLN Indonesia Power   the midst of various obstacles and challenges, PLN Indonesia Power
            terus memperkuat segmen EBT sebagai second curve of business   had managed to strengthen the NRE segment as the second curve of
            Perusahaan. Disamping itu, Dewan Komisaris juga meminta   business. Apart from that, the Board of Commissioners also requires
            Direksi untuk secara konsisten dan berkelanjutan menerapkan co-  the Board of Directors to consistently and continuously implement
            firing PLTU batubara, program pengendalian dan reduksi emisi,   co-firing in coal-fired SPPs, carry out emission control and reduction
            implementasi carbon cap dan carbon trade antar pembangkit, serta   programs, implement carbon caps and carbon trade among power
            menjamin ketersediaan pasokan menjadi peran dan kontribusi PLN   plants, and ensure the availability of supply. These are the role and
            Indonesia Power dalam mencapai bauran energi Nasional di tahun   contribution of PLN Indonesia Power in achieving the national energy
            2025 dan transisi energi masa depan.               mix by 2025 and future energy transition.
            Terkait pengembangan produk dan layanan, Dewan Komisaris   In the area of product and service development, the Board of
            mendukung upaya Direksi yang berhasil meluncurkan produk beyond   Commissioners commends  the  Board of  Directors'  success  in
            kWh, yang menjadi hasil inovasi strategis tiada henti menjadi salah   launching beyond kWh products, which are the result of continuous
            satu unggulannya, yang ditargetkan menjadi sumber pendapatan   strategic innovation and are one of the mainstays, which are
            di luar penjualan tenaga listrik. Dewan Komisaris mengapresiasi   targeted to become a source of income outside of electricity sales.
            pengembangan usaha beyond boundaries yang kian menunjukkan   The Board of Commissioners appreciates the business development
            hasil positif, yakni adanya kerjasama di bidang operasi, pemeliharaan   beyond boundaries which is increasingly showing positive results,
            dan  peralatan pembangkit  dengan perusahaan  asal Vietnam  dan   namely cooperation in the fields of operations, maintenance and
            Kuwait. Selain itu, Dewan Komisaris juga memberikan apresiasi   equipment generator with companies from Vietnam and Kuwait.
            kepada Direksi karena telah berhasil mendukung kelancaran acara   The Board of Commissioners also commends the Board of Directors
            Presidensi G20 di Bali, dengan melakukan relokasi Pembangkit   for their assist in the successful G20 Presidency in Bali, through
            Listrik Tenaga Gas (PLTG) dari Grati ke Pesanggaran, Bali yang   the relocation of Gas Turbine Power Plant (GTPP) from Grati to
            diselesaikan dalam 10 (sepuluh) bulan, membangun PLTS Muara   Pesanggaran which was completed in 10 (ten) months, as well as the
            Nusa Dua dalam waktu 3 (tiga) bulan, dan PLTS Nusa Penida dalam   construction of SoPP Muara Tukad Nusa Dua in 3 (three) months,
            waktu 8 (delapan) bulan.                           and SoPP Nusa Penida in 8 (eight) months.