          Perbandingan antara Target 2022, Realisasi 2022 dan Proyeksi 2023
          Comparison between 2022 Target, 2022 Realization, and 2023 Projection


          Realisasi EAF Pembangkit Jasa O&M Jawa tahun 2022 sebesar   Realized EAF for O&M Service power plants in Java in 2022 was
          91,05% dengan pencapaian 101,60% dari target RKAP 2022. EAF   91.05%, or 101.60% of WP&B 2022 target. The EAF target was met
          tercapai karena tidak adanya pekerjaan overhaul di Banten Suralaya   because there was no overhaul work in SPP Banten 1 Suralaya OMU
          PGU selama tahun 2022.                             throughout 2022.

          Realisasi SOF Pembangkit Jasa O&M Jawa tahun 2022 sebesar   Realized SOF for O&M Service power plants in Java in 2022 was
          6,15% dengan pencapaian 110,85% dari target RKAP 2022. SOF   6.15%, or 110.85% of WP&B 2022 target. The SOF target was met
          tercapai karena tidak adanya pekerjaan overhaul di Banten Suralaya   because there was no overhaul work in SPP Banten 1 Suralaya OMU
          PGU selama tahun 2022.                             throughout 2022.

          Realisasi EFOR Pembangkit Jasa O&M Jawa tahun 2022 sebesar 0,65%   Realized EFOR for O&M Service power plants in Java in 2022 was
          dengan pencapaian 175,27% dari target RKAP 2022. Hal ini menunjukkan   0.65%, or 175.27% of WP&B 2022 target. This shows that O&M
          bahwa unit pembangkit Jasa O&M Jawa dapat menurunkan jumlah   Service power plants in Java were capable of reducing outage
          durasi gangguan di tahun 2022 dibandingkan tahun 2021.  duration in 2022 compared to in 2021.

          Realisasi SdOF Pembangkit Jasa O&M Jawa tahun 2022 sebesar   Realized SdOF for O&M Service power plants in Java in 2022 was
          0,77%  dengan  pencapaian  166,58%  dari  target  RKAP  2022.  Hal   0.77%, or 166.58% of WP&B 2022 target. This shows that O&M
          ini menunjukkan bahwa unit pembangkit Jasa O&M Jawa dapat   Service power plants in Java were capable of reducing outage
          menurunkan jumlah durasi gangguan di tahun 2022 dibandingkan   duration in 2022 compared to in 2021.
          tahun 2021.

          Target dan Realisasi Kinerja Pembangkit Jasa O&M Luar Jawa
          Java O&M Service Power Plant Performance Target and Realization
          Berikut adalah realisasi pencapaian target Kinerja Pembangkit Jasa   The following is the realization of Outside Java O&M Service power
          O&M Luar Jawa:                                     plant performance target:

          Tabel Perbandingan Target dengan Realisasi Kinerja Pembangkit Jasa O&M Luar Jawa 2022
          Table of Comparison of Outside Java O&M Service Power Plant Performance Target and Realization in 2022

               Kinerja Pembangkit Jasa O&M Luar Jawa
                                                                         Realisasi 2022
                                                    Target RKAP 2022
                                                                                               Pencapaian
           Performance of O&M Service Power Plants outside   WP&B 2022 Target  2022 Realization  Achievement
                           Java
          EAF (%)                                       84,98                74,35              87,50%
          SOF (%)                                       10,44                6,54              137,36%
          EFOR (%)                                       4,27                18,86             (241,70)%
          SdOF (kali) (time)                             6,89                4,55              133,95%


          Realisasi EAF Pembangkit Jasa O&M Luar Jawa tahun 2022 sebesar   Realized EAF for O&M Service power plants outside Java in 2022
          74,35% dengan pencapaian 87,50% dari target RKAP 2022. EAF   was 74.35%, or 87.50% of WP&B 2022 target. The EAF target was
          tidak tercapai karena penurunan EAF di Pangkalan Susu PGU 1-4   unmet due to declining EAF in SPP Pangkalan Susu OMU 1-4 as a
          karena derating akibat gangguan kualitas batubara.  result of derating due to declining coal quality.

          Realisasi SOF Pembangkit Jasa O&M Luar Jawa tahun 2022 sebesar   Realized SOF for O&M Service power plants outside Java in 2022
          6,54% dengan pencapaian 137,36% dari target RKAP 2022. Hal   was 6.54%, or 137.36% of WP&B 2022 target. This was mainly due
          tersebut terutama disebabkan oleh pelaksanaan Planned Outage dan   to the implementation of Planned Outage and Maintenance Outage
          Maintenance Outage perbaikan boiler pada Pangkalan Susu PGU.  for SPP Pangkalan Susu PGU’s boiler repair.

          Realisasi EFOR Pembangkit Jasa O&M Luar Jawa tahun 2022 sebesar   Realized EFOR for O&M Service power plants outside Java in 2022
          18,86% dengan pencapaian (241,70)% dari target RKAP 2022. EFOR   was 18.86%, or (241.70)% of WP&B 2022 target. The EFOR target
          tidak tercapai karena gangguan peralatan mill dan kebocoran boiler   was unmet due to disturbance to mill and boiler leakage in SPP
          pada unit Pangkalan Susu PGU.                      Pangkalan Susu PGU.