Equivalent Availability Factor (EAF) Equivalent Availability Factor (EAF)
Pembangkit Jasa O&M Jawa of O&M Service Power Plants in Java
Semakin tinggi nilai EAF menunjukkan tingkat kesiapan Higher EAF score indicates better readiness of the power plant.
pembangkit lebih baik.
Equivalent Availability Factor (EAF) pembangkit jasa O&M Jawa The Equivalent Availability Factor (EAF) of O&M Service power
tahun 2022 sebesar 91,05% yaitu meningkat 1,35% dibandingkan plants in Java in 2022 was 91.05%, which was higher by 1.35%
tahun 2021. Peningkatan tersebut terutama disebabkan karena than in 2021. This was due to the absence of overhaul works in SPP
tidak adanya pekerjaan overhaul di Banten 1 Suralaya PGU selama Banten 1 Suralaya PGU throughout 2022.
tahun 2022.
Tabel EAF Unit Pembangkit Jasa O&M Jawa Tahun 2019 - 2022 (%)
Table of Java O&M Service Generation Unit EAF in 2019-2022 (%)
Unit Pembangkit 2019 2020 2021 2022 Pertumbuhan
Generation Unit Growth
Banten 1 Suralaya PGU 55,79 71,40 59,22 69,42 17,22%
Banten 2 Labuan PGU 79,85 90,02 84,39 88,93 5,38%
Banten 3 Lontar POMU 92,94 83,28 94,70 90,00 (4,96)%
Jawa Barat 2 Pelabuhan Ratu PGU 83,38 90,97 91,23 91,34 0,12%
West Java 2 Pelabuhan Ratu PGU
Jawa Tengah 2 Adipala PGU 93,83 85,17 86,20 88,81 3,03%
Central Java 2 Adipala PGU
Priok Blok 3 PGU Priok Block 3 PGU 84,44 93,74 92,04 97,40 5,82%
Priok Blok 4 PGU Priok Block 4 PGU 86,95 97,41 96,12 95,18 (0,98)%
Cilegon PGU 91,84 95,82 98,69 95,43 (3,30)%
Grati Blok 3 PGU Grati Block 3 PGU 89,83 99,26 99,95 100,00 0,05%
Jumlah EAF Pembangkit Jasa O&M Jawa 84,72 89,80 89,84 91,05 1,35%
Total EAF of O&M Service Power Plants in Java
Scheduled Outage Factor (SOF) Scheduled Outage Factor (SOF)
Pembangkit Jasa O&M Jawa of O&M Service Power Plants in Java
Semakin rendah nilai SOF menunjukkan unit pembangkit dapat Lower SOF indicates better generation unit’s performance in
melakukan optimasi dalam pemeliharaan yang direncanakan. optimizing the planned maintenance.
Scheduled Outage Factor (SOF) pembangkit jasa O&M Jawa tahun The Scheduled Outage Factor (SOF) of O&M Service power plants
2022 sebesar 6,15% yaitu lebih rendah 20,75% dibandingkan in Java in 2022 was 6.15%, which was lower by 20.75% than in 2021.
tahun 2021. Hal tersebut terutama disebabkan karena tidak adanya This was due to the absence of overhaul works in Banten 1 Suralaya
pekerjaan overhaul di Banten 1 Suralaya PGU selama tahun 2022. PGU throughout 2022.
Tabel SOF Unit Pembangkit Jasa O&M Jawa Tahun 2019 - 2022 (%)
Table of Java O&M Service Generation Unit SOF in 2019-2022 (%)
Unit Pembangkit 2019 2020 2021 2022 Pertumbuhan
Generation Unit Growth
Banten 1 Suralaya PGU 17,77 6,91 29,93 10,91 (63,55)%
Banten 2 Labuan PGU 6,83 2,81 13,75 10,89 (20,80)%
Banten 3 Lontar POMU 2,31 12,64 3,00 9,22 207,33%