Tinjauan Kinerja Operasi Per Segmen
Operational Performance Overview by Segment
Tabel Pembangkit Jasa Operating and Maintenance (O&M)
Table of Operations and Maintenance (O&M) Service for Power Plants
Nama Unit Status kontrak Jasa yang Diberikan
Name of Unit Contract Status Provided Service
Banten 1 Suralaya PGU AMC Asset Manager
Banten 2 Labuan PGU AMC Asset Manager
Banten 3 Lontar POMU AMC Asset Manager
Jawa Barat 2 Pelabuhan Ratu PGU AMC Asset Manager
West Java 2 Pelabuhan Ratu PGU
Jawa Tengah 2 Adipala PGU AMC Asset Manager
Central Java 2 Adipala PGU
Pangkalan Susu PGU AMC Asset Manager
Priok Blok 3 PGU Priok Block 3 PGU AMC Asset Manager
Barru POMU AMC Asset Manager
Jeranjang OMU AMC Asset Manager
Sanggau PGU Kontrak Performance Based Asset Operator
Performance-Based Contract
Ulumbu Sub-Unit Kamojang POMU Kontrak Supporting Asset Operator
Supporting Contract
Cilegon PGU AMC Asset Manager
Holtekamp OMU Kontrak Supporting Asset Operator
Supporting Contract
Sintang PGU Kontrak Performance Based Asset Operator
Performance-Based Contract
Priok Blok 4 PGU Priok Block 4 PGU AMC Asset Manager
Grati Blok 3 PGU Grati Block 3 PGU AMC Asset Manager
Berau PGU Kontrak Supporting Asset Operator
Supporting Contract
Kinerja Pembangkit Jasa O&M
Performance of O&M Service Power Plants
Sejak tahun 2016, PLN Indonesia Power mendapatkan kontrak Since 2016, PLN Indonesia Power has been securing the asset
pengelolaan jasa O&M secara menyeluruh (asset manager contract) manager contract (AMC) of O&M service for the entire power
untuk pembangkit di Pulau Jawa, dimana PLN Indonesia Power plants in Java, in which PLN Indonesia Power is responsible for the
bertanggung jawab terhadap kinerja pembangkit yang dikelola performance of the power plants under their management.
tersebut.
Kinerja pembangkit jasa O&M PLN Indonesia Power dibedakan PLN Indonesia Power O&M Service power plants are spread in two
menjadi dua yaitu Jawa dan Luar Jawa. areas, i.e., in Java and outside Java.
Kinerja Unit Pembangkit Jasa O&M Jawa
Performance of O&M Service Generation Units in Java
Daya Terpasang Pembangkit (DTP) Jasa O&M Jawa Installed Capacity of O&M Service Power Plants in Java
DTP Pembangkit Jasa O&M Jawa pada tahun 2022 sebesar 6.782,70 The installed capacity of O&M Service power plants in Java in 2022
MW sama dengan tahun 2021. was 6,782.70 MW, which remained the same with that in 2021.