            Mekanisme Pembangunan Bersih atau  Clean Development   Clean Development Mechanism (CDM) has the objective to produce
            Mechanism (CDM) memiliki tujuan untuk menghasilkan proyek   projects that can reduce greenhouse gas emissions. Indonesia
            yang dapat menurunkan emisi gas rumah kaca. Indonesia Power   Power has conducted CDM on the GPP Gunung Salak Unit.
            telah melakukan CDM pada Unit PLTP Gunung Salak.
            Pada tahun 1994, dua unit pembangkit listrik mulai beroperasi   In 1994, two units of power plant started to operate with the capacity
            dengan kapasitas 2x55 MW. Tiga tahun kemudian satu unit   of 2x55 MW. Three years later, an additional unit could be operated
            tambahan lagi dapat dioperasikan dengan kapasitas yang sama.   with the same capacity. In 2004, the capacity of generators was
            Pada tahun 2004, kapasitas pembangkit dinaikkan menjadi   upgraded to 3x60 MW through Capacity Upgrade Program, hence
            3x60  MW  melalui  program  Capacity  Upgrade,  sehingga  produk   the product generated is in the form of electricity that is channeled
            yang dihasilkan berupa energi listrik dapat disalurkan ke sistem   into  the  electrification  system  in  Java  Bali  Madura  with  a  total
            ketenagalistrikan Jawa Bali Madura dengan total kapasitas 180   capacity of 180 MW.
            MW.

            Proyek capacity upgrade Unit PLTP Gunung salak ini diikutsertakan   The capacity upgrade project for GPP Gunung Salak Unit was
            dalam  proyek  CDM  melalui  metode  Voluntary  Carbon  Standard   included in the CDM project through the Voluntary Carbon Standard
            (VCS). Verifikasi dan validasi proyek ini selesai pada tahun 2009   (VCS) method. The verification and validation of this project was
            dan hingga sekarang Unit PLTP Gunung Salak telah menghasilkan   completed  in  2009  and  until  now  GPP  Gunung  Salak  Unit  has
            reduksi emisi karbon sebesar 1,603,457.00 ton VCUs.  produced carbon emission reduction in the amount of 1,603,457.00
                                                              tons VCUs.
                        Emisi GRK yang Dijual/Dilelang/Diberikan Melalui Skema CDM di Unit Gunung Salak
                             GHG Emissions Sold/Auctioned/Given Through the CDM Scheme in Gunung Salak Unit
                                                                    Verified Emission Reduction (VER)
                              Tahun                                         (Ton VCUs)
                              Year
                                                          Verified            Sold               Remain
                              2009                             281,802.00          2,500.00         279,302.00
                              2010                                   -                  -            258,727.28
                              2011                             261,713.00          21,574.72         361,461.35
                              2012                            203,735.00          158,978.93         453,827.35
                              2013                                   -                  -            359,591.35
                              2014                             118,763.00          111,369.00        478,256.58
                              2015                                   -                  -            478,256.58
                              2016                             301,933.00         94,236.00          478,256.58
                              2017                             131,498.00            94.77           478,256.58
                              2018                                   -                  -            478,256.58
                              2019                             304,016.00         352,255.00         478,257.58
                              2020                                   -                  -            478,257.58
                              2021                                   -                  -            478,257.58
                              Total                          1,603,457.00         741,008.42
            Catatan: Update Invoice 20 Desember 2018 (14 Januari 2019)
            Remark: Update Invoice as of 20 December 2018 (14 January 2019)







            PT INDONESIA POWER 2021 Sustainability Report
                                                                                                           217
   212   213   214   215   216   217   218   219   220   221   222