Page 205 - Sustainability Report 2021 - Indonesia Power
P. 205

Providing Environmental Sustainability
                                                                      Towards Carbon Neutrality




                                                                       PENGELOLAAN PENGGUNAAN DAN EFISIENSI ENERGI
                                                                          ENERGY CONSUMPTION AND EFFICIENCY MANAGEMENT






                                                                          Nilai Efisiensi Energi Tahunan (Gigajoule)
                    Unit Kerja   Jenis Energi     Program PPME              Annual Energy Efficiency (Gigajoules)
             No
                    Work Unit    Energy Type      PPME Program
                                                                        2018      2019     2020       2021
              7  Mrica PGU      Air        -  Penggantian Lampu TL menjadi   -     304,48     80,46     218,88
                                Water       Lampu LED Sub unit
                                           -  Penggantian Air Conditioner gedung
                                            kantor menggunakan AC inverter
                                           -  Program inovasi lainnya
                                           -  Replacement of TL to LED lamps in
                                            the Sub units
                                           -  Replacement of Air Conditioner in
                                            the office building to Inverter AC
                                           -  Other innovation programs
              8  Bali PGU Pesanggaran  HSD, MFO,   -  Pengaturan rasio kompresi PLTDG   16.383,76  10.182,59  94.656,89  83.841,25
                                Gas dan     Pesanggaran
                                BioFame    -  Merubah setting radiator fan oli
                                HSD, MFO,   unit dan mengurang jumlah fan
                                Gas, and    turbin ventilasi serta meng-off-kan
                                BioFame     compresor atlas copco saat unit
                                            standby
                                           -  Program inovasi lainnya
                                           -  Setting the compression ratio of
                                            DGPP Pesanggaran
                                           -  Changing the unit's oil fan radiator
                                            setting, reducing the ventilation
                                            turbine fans, and turning off the
                                            Atlas Copco compressor during
                                            standby
                                           -  Other innovation programs
              9  PLTU Banten 1   Batubara   -  Optimalisasi pemilihan batubara   1.753.449,98  1.941.858,17  1.446.055,46  189.767,06
                 Suralaya OMU   Coal        dengan nilai moisture yang rendah
                                           -  Inspeksi burner
                                           -  Program inovasi lainnya
                                           -  Optimizing the selection of coal
                                            with low moisture value
                                           -  Burner inspection
                                           -  Other innovation programs
             10  PLTU Banten 2   Batubara   -  Optimalisasi Mill Out Temp pada   234.200,23  258.184,47  1.680.666,66  17.830.943,79
                                               o
                 Labuan OMU     Coal        55-57 C
                                           -  Pemasangan Sensor Furnace Exit
                                            Gas Temperature pada Unit 1 sisi A
                                           -  Program inovasi lainnya
                                           -  Optimization of Mill Out Temp at
                                            55-57oC
                                           -  Installation of the Furnace Exit Gas
                                            Temperature Sensor on Unit 1 side A
                                           -  Other innovation programs
              11  PLTU Banten 3 Lontar   Batubara   -  Pembuatan panduan di DCS sebagai   13.584.756,51  14.073.271,62  13.474.159,98  21.007.901,80
                 OMU            Coal        optimalisasi start up unit 1
                                           -  Forced cooling first stage metal
                                            temperature turbine untuk
                                            menghemat waktu overhaull
                                           -  Program inovasi lainnya
                                           -  Formulation of manuals in DCS as
                                            an optimization of start up unit 1
                                           -  Forced cooling first stage metal
                                            temperature turbine to save
                                            overhaul time
                                           -  Other innovation programs









            PT INDONESIA POWER 2021 Sustainability Report
                                                                                                           205
   200   201   202   203   204   205   206   207   208   209   210