Providing Environmental Sustainability
Towards Carbon Neutrality
PENGELOLAAN PENGGUNAAN DAN EFISIENSI ENERGI
ENERGY CONSUMPTION AND EFFICIENCY MANAGEMENT
Nilai Efisiensi Energi Tahunan (Gigajoule)
Unit Kerja Jenis Energi Program PPME Annual Energy Efficiency (Gigajoules)
No
Work Unit Energy Type PPME Program
2018 2019 2020 2021
7 Mrica PGU Air - Penggantian Lampu TL menjadi - 304,48 80,46 218,88
Water Lampu LED Sub unit
- Penggantian Air Conditioner gedung
kantor menggunakan AC inverter
- Program inovasi lainnya
- Replacement of TL to LED lamps in
the Sub units
- Replacement of Air Conditioner in
the office building to Inverter AC
- Other innovation programs
8 Bali PGU Pesanggaran HSD, MFO, - Pengaturan rasio kompresi PLTDG 16.383,76 10.182,59 94.656,89 83.841,25
Gas dan Pesanggaran
BioFame - Merubah setting radiator fan oli
HSD, MFO, unit dan mengurang jumlah fan
Gas, and turbin ventilasi serta meng-off-kan
BioFame compresor atlas copco saat unit
standby
- Program inovasi lainnya
- Setting the compression ratio of
DGPP Pesanggaran
- Changing the unit's oil fan radiator
setting, reducing the ventilation
turbine fans, and turning off the
Atlas Copco compressor during
standby
- Other innovation programs
9 PLTU Banten 1 Batubara - Optimalisasi pemilihan batubara 1.753.449,98 1.941.858,17 1.446.055,46 189.767,06
Suralaya OMU Coal dengan nilai moisture yang rendah
- Inspeksi burner
- Program inovasi lainnya
- Optimizing the selection of coal
with low moisture value
- Burner inspection
- Other innovation programs
10 PLTU Banten 2 Batubara - Optimalisasi Mill Out Temp pada 234.200,23 258.184,47 1.680.666,66 17.830.943,79
o
Labuan OMU Coal 55-57 C
- Pemasangan Sensor Furnace Exit
Gas Temperature pada Unit 1 sisi A
- Program inovasi lainnya
- Optimization of Mill Out Temp at
55-57oC
- Installation of the Furnace Exit Gas
Temperature Sensor on Unit 1 side A
- Other innovation programs
11 PLTU Banten 3 Lontar Batubara - Pembuatan panduan di DCS sebagai 13.584.756,51 14.073.271,62 13.474.159,98 21.007.901,80
OMU Coal optimalisasi start up unit 1
- Forced cooling first stage metal
temperature turbine untuk
menghemat waktu overhaull
- Program inovasi lainnya
- Formulation of manuals in DCS as
an optimization of start up unit 1
- Forced cooling first stage metal
temperature turbine to save
overhaul time
- Other innovation programs