Page 187 - Sustainability Report 2021 - Indonesia Power
P. 187

Providing Optimized Economic Performance
                                                                For National Economic Development




                                                                     MENGHADIRKAN PELAYANAN TERBAIK BAGI PELANGGAN
                                                                               PROVIDING THE BEST SERVICE FOR CUSTOMERS





                                           Media Komunikasi Pengaduan Pelanggan
                                            Customer Complaint Communication Media

                 Media
               Komunikasi               PLN melalui PLN UI P2B          PLN melalui PLN Distribusi   PLN pelanggan
                Utama                (energi listrik 500kV dan 150 kV)    (energi listrik ≤20kV)   jasa O&M
                 Main                   PLN through PLN UI P2B          PLN through PLN Distribusi   PLN O&M service
             Communication            (500kV and 150 kV electricity)      (electricity≤ 20kV))  customers
                 Media
                          Telepon/WhatsApp                             -  021-526 7666      -  021-526 7666:
                          -  021-526 7666                              -  0811 937 740 (HP/WhatsApp   koordinasi, progres,
                          -  0811 937 740 (HP/WhatsApp ETMC)            ETMC)                kajian
                          -  Ext.2222/3333: Operasional real time (ETMC)  -  Telepon direct ETMC: 021-522   -  0811 937 740 (HP/
                          -  Ext.2222/3333: Realisasi kinerja pembangkit  9813               WhatsApp ETMC)
                          Phone/WhatsApp                               -  021-526 7666      -  Telepon personal:
                          -  021-526 7666                              -  0811 937 740 (HP/WhatsApp   koordinasi, progres,
                          -  0811 937 740 (HP/WhatsApp ETMC)            ETMC)                kajian
                          -  Ext.2222/3333: Real time (ETMC)           -  Direct Call to ETMC: 021-522   -  021-526 7666:
                          -  Ext.2222/3333: Generator performance realization  9813          coordination, progress,
                Telepon/                                                                     review
               WhatsApp   Harian Deklarasi Ketidaksiapan Pembangkit (HDKP)                  -  0811 937 740 (HP/
                 Phone    -  WA Group-ROM P2B-IP: Komunikasi ROM                             WhatsApp ETMC)
                          -  Handphone ETMC 0811 937 740: Kondisi pembangkit dan operasional  -  Personal phone:
                          -  Hotline Unit Pembangkit: Naik turun beban, Start-stop pembangkit,   coordination, progress,
                           kondisi pembangkit                                                review
                          Daily Statement on Power Plant Unreadiness (HDKP)
                          -  WA Group-ROM P2B-IP: ROM Communication
                          -  Handphone ETMC 0811 937 740: Power plant and operational conditions
                          -  Generating Unit Hotline: Load fluctuation, power plant start-stop,
                           plant’s conditions
                          -  Aplikasi HDKS (Rapsodi): naik turun beban dan start-stop pembangkit  -  -
                          -  Aplikasi HDKP IKP: ketidaksiapan pembangkit
                          -  Aplikasi GAIS: kinerja pembangkit
                          -  Aplikasi JBOS Plan: perencanaan pembangkit
                          -  Aplikasi ProNIA: kondisi realtime sistem pembangkitan
                          -  Aplikasi Neraca Energi: kWh energi
                          -  HDKS (Rapsodi): load fluctuation and power plant start-stop
                Website   -  HDKP IKP: power plant unreadiness
                          -  GAIS: power plant performance
                          -  JBOS Plan: power plant planning
                          -  ProNIA: real-time condition of the power plant system
                          -  Neraca Energi: energy kWh
                          etmc@indonesiapower.co.id                    E-mail kepada DIV CST I/   E-mail ke PST II/ personal
                          perencanaan operasi, operasional real time   personal e-mail: Settlement/  e-mail
                          etmc@indonesiapower.co.id                    kontrak              E-mail to PST II/personal
                 Email    operational planning, real-time operations   E-mail to DIV CST I/personal   e-mail
                                                                       e-mail: Settlement/contract
                          PT Indonesia Power                           PT Indonesia Power   PT Indonesia Power
                          Jl. Jend. Gatot Subroto Kav 18,              Jl. Jend. Gatot Subroto Kav 18,   Jl. Jend. Gatot Subroto Kav
                          Jakarta Selatan, 12950:                      Jakarta Selatan, 12950:  18, Jakarta Selatan, 12950:
                          Settlement/Kontrak                           Settlement/Kontrak
               Surat Letter                                                                 Settlement/Kontrak
                          Rapat Alokasi Energi (RAE) dan Rapat pembahasan Kontrak   Rapat pembahasan kontrak dan   Rapat Alokasi Energi (RAE)
                          dan Settlement                               settlement           dan Rapat Rekonsiliasi
                          Energy Allocation Meeting (RAE) and Contract and   Contract and settlement   Jasa O&M (Kontrak dan
                          Settlement discussion                        discussion meeting   Settlement)
                                                                                            Energy Allocation Meeting
                 Rapat                                                                      (RAE) and O&M Services
                Meeting
                                                                                            Reconciliation Meeting
                                                                                            (Contract and Settlement)
             Selama tahun 2021, Indonesia Power tidak menerima pengaduan   In  2021,  Indonesia  Power  did  not  receive  complaints  from
             dari  pelanggan  terkait  aspek  kesehatan  dan  keselamatan   customers  regarding  customers'  health  and  safety  in  the
             pelanggan terkait dengan pendistribusian listrik kepada pelanggan   electricity  transmission  to  customers,  and  regarding  non-
             dan juga terkait aspek ketidakpatuhan atas penyediaan informasi   compliance  with  the  provision  of  product  information  and
             produk  dan  komunikasi  pemasaran,  sehingga  Indonesia  Power   marketing communications. Therefore, Indonesia Power was not
             tidak mendapat sanksi moneter maupun non moneter.  sanctioned, monetarily or non-monetarily.


            PT INDONESIA POWER 2021 Sustainability Report
                                                                                                           187
   182   183   184   185   186   187   188   189   190   191   192