Page 60 - Laporan Statistik 2022 - PLN Indonesia Power
P. 60
Statistic Report
PT PLN Indonesia Power 2022
kinerJa OPerasiOnaL
operational perFormanCe
Tabel 21. Kinerja Capacity Factor (CF) Tahun 2018-2022
Table 21. Performance of Capacity Factor in 2018–2022
Unit Pembangkit CF (%)
Generation Unit 2018 2019 2020 2021 2022
a. Jawa Bali Grid & embedded/
Java Bali Grid Embedded
Suralaya PGU 82,96 82,46 75,87 80,87 78,44
Priok PGU 42,63 34,72 17,08 31,46 16,60
Saguling POMU 34,34 33,84 40,27 37,87 48,25
Kamojang POMU 87,55 83,86 84,15 87,84 82,98
Semarang PGU 45,36 33,18 10,28 26,90 26,50
Mrica PGU 31,99 28,03 31,44 36,23 41,75
Grati PGU 28,45 18,64 23,80 24,87 29,76
Bali PGU 23,37 20,34 20,49 19,75 22.85
TOTAL 57,45 52,81 45,80 51,82 50,82
B. Pembelian Listrik/ Power Purchase
Pembelian Listrik Power Purchase 11,90 58,81 - - -
TOTAL 57,07 52,82 45,80 51,82 50,82
Grafik 22. Kinerja Capacity Factor (CF) Tahun 2018-2022 (%)
Graph 22. Performance of Capacity Factor in 2018–2022 (%)
57,07 52,82 45,80 51,82 50,82
2018 2019 2020 2021 2022
60 Statistic Report www.plnindonesiapower.co.id
PT PLN Indonesia Power 2022