            tabel 5. pengiriman Energi ke Sistem Jawa Bali tahun 2018-2022
            Table 5. Energy Transferred to Java Bali System ini 2018-2022


                                        2018           2019           2020           2021           2022
                   perusahaan
                    Company
                                     MW      %      MW      %      MW      %      MW      %      MW      %
             PT PLN Indonesia Power    40.151   21,40   37.391   19,22   33.117    17,64    37.426   18,99  35.751  17,11
             PT PLN Nusantara Power    24.825   13,23   22.338   11,48   17.055    9,09    19.779   10,04  16.256  7,78
             UB Tanjung Jati B         19.529   10,41   20.390   10,48   17.532    9,34    18.884   9,58  19.268  9,22
             IPP                       48.322   25,76   51.553   26,50   61.244    32,63    67.568   34,29  80.781  38,66
             Unit O&m dikelola oleh PLN IP
             The O&M Unit is managed by    28.466   15,17   33.947   17,45   32.341    17,23    28.709   14,57  30.351  14,53
             PLN IP
             Unit O&M dikelola oleh PLN NP
             The O&M Unit is managed by    25.932   13,82   28.574   14,69   26.294    14,01    24.529   12,45  26.259  12,57
             PLN NP
             Project*                   379   0,20      346   0,18   135,00   0,07    145   0,07    261   0,13
             Sistem Jawa Bali        187.605  100,00  194.539  100,00  187.718   100,00   197.039   100,00  208.929  100,00
             Java Bali System
            Keterangan:                                       Notes:
            *   PLN (Proyek) adalah unit pembangkit yang masih proyek, belum diserah terima kan   *   PLN (Project Unit) is a generating unit which is still a project, which has not been handed over
              pencatatan energinya ke unit pembangkit           the recording of its energy to the generating unit





            grafik 3. pengiriman Energi ke Sistem Jawa Bali tahun 2018-2022 (gWh)
            Graph 3. Energy Transferred to Java Bali System in 2018-2022 (GWh)



                     187.605 gWh      194.539 gWh       187.718 gWh        197.039 gWh       208.929 gWh


                                                                                       0,13%
                                  19,22%                             18,99%            12,57%
                21,40%                              17,64%
                                                                                       14,53%
                13,23%            11,48%            9,09%            10,04%
                10,41%           10,48%             9,34%             9,58%
                                                                                       38,66%
                25,76%            26,5%            32,63%            34,29%
                                                                                       9,22%
                15,17%           17,45%             17,23%           14,57%            7,78%
                13,82%           14,69%             14,01%           12,45%
                0,20%             0,18%             0,07%             0,07%            17,11%

                        2018             2019              2020               2021               2022




                  PT PLN Indonesia Power  PT PLN Nusantara Power    Unit Tanjung Jati B   IPP*
                  Unit O&M dikelola oleh PLN IP  Unit O&M dikelola oleh PLN NP  PLN (Proyek)*
                  The O&M Unit is managed by PLN IP  The O&M Unit is managed by PLN NP

                                                                                       Laporan Statistik 2022
            www.plnindonesiapower.co.id                                                  PT PLN Indonesia Power  29
   24   25   26   27   28   29   30   31   32   33   34