                       pgU                     oMU                     poMU                   Subsidiaries
                    total: 16 Unit           total: 2 Unit            total: 4 Unit           total: 6 Unit
               Daya terpasang: 14.364,75 MW  Daya terpasang: 114 MW  Daya terpasang: 2.419,36 MW  Daya terpasang: 373 MW
                     Total: 16 Unit           Total: 2 Unit           Total: 4 Unit           Total: 6 Unit
               Installed Capacity: 14,364.75 MW  Installed Capacity: 114 MW  Installed Capacity: 2,419.36 MW  Daya Terpasang: 373 MW

                                                                                              Unit hSh
                                                                                               hSh Unit
              UpDk pgCiU Mahakam (404,48 MW)                                                 total: 12 Unit
                                                                                         Daya terpasang: 2.622,11 MW
                                                   pLtD Dpp Batakan (40 MW)                   Total: 12 Unit
                  Berau pgU (17 MW)                                                      Installed Capacity: 2,622.11 MW

                 pLtU Spp Lati (3x7 MW)          Upk pgiU asam-asam (268,4 MW)


              pLtU Spp Muara Jawa (2x27,5 MW)
                                                                                          Mpp Sorong (5x10 MW)*

                                                                                         Mpp Manokwari 2 (2x10 MW)*


                                                                                           Mpp Biak 2 (10 MW)*



                       Barru poMU (100 MW)



                            UpDk pgCiU tello (130,67 MW)




               pLtD Dpp nusa penida (10 MW)




                                                          Mpp nabire 2 (10 MW)*

                                                           Mpp timika (10 MW)*

                                                         holtekamp oMU (24 MW)
                Bali pgU (842,08 MW)
                                                          Mpp Merauke 2 (20 MW)*
               grati pgU (1.281,21 MW)

              Semarang pgU (1.238,30 MW)
                                                                                             * di bawah Pengelolaan Bali PGU
                                                                                             * under management of Bali PGU





            Throughout 2022, PLN Indonesia Power has been appreciated and awarded in many sectors, both in the national and international
            level. Some awards obtained are International Invention, Innovation & Technology Exhibition 2022, TOP CSR Awards 2022, TOP GRC
            Award 2022, ASEAN Energy Awards (AEA) 2022, Subroto Awards In Energy Efficiency (PSBE) 2022, Asia Sustainability Reporting Rating
            (ASRRAT) 2022, Proper Awards 2022

                                                                                       Laporan Statistik 2022
            www.plnindonesiapower.co.id                                                  PT PLN Indonesia Power  15
   10   11   12   13   14   15   16   17   18   19   20