          Equivalent Forced Outage Rate (EFOR)               Equivalent Forced Outage Rate (EFOR)
          Pembangkit Jasa O&M Luar Jawa                      of O&M Service Power Plants outside Java

          Semakin rendah nilai EFOR menunjukkan keandalan unit   The  lower  EFOR,  the  better  generation  unit’s
          pembangkit lebih baik dan dapat mengatasi gangguan lebih   reliability  and  the  faster  outages  are  handled.
          cepat.

          Equivalent Forced Outage Rate  (EFOR) pembangkit jasa O&M   The Equivalent Forced Outage Rate (EFOR) of O&M Service power
          Luar Jawa tahun 2022 sebesar 18,86% yaitu meningkat 378,68%   plants outside Java in 2022 was 18.86%, which was an increase by
          dibandingkan tahun 2021. Peningkatan tersebut terutama   378.68% from 2021. This was particularly resulted by disruption
          disebabkan oleh gangguan peralatan  mill dan kebocoran  boiler   to mill and boiler leakage in Pangkalan Susu PGU.
          pada unit Pangkalan Susu PGU.

          Tabel EFOR Unit Pembangkit Jasa O&M Luar Jawa Tahun 2019 - 2022 (%)
          Table of Outside Java O&M Service Generation Unit EFOR in 2019-2022 (%)

                         Unit Pembangkit                2019       2020       2021       2022     Pertumbuhan
                          Generation Unit                                                           Growth

          Pangkalan Susu 1-2 PGU                          42,64       8,92      13,83      29,15    110,77
          Pangkalan Susu 3-4 PGU                              -          -          -      16,19      -
          Barru POMU                                        3,15       8,11      5,39       6,10    13,17%
          Jeranjang OMU                                    13,21      17,73      4,57       4,23   (7,44)%
          Sanggau PGU                                      4,25       3,80       2,04       0,87   (57,35)%
          Sintang PGU                                       1,99      2,59       2,45       2,18   (11,02)%
          Holtekamp OMU                                    0,70        1,01      4,34       4,12   (5,07)%
          Berau PGU                                           -          -       2,58       0,77   (70,16)%
          Ulumbu Sub-Unit Kamojang POMU                    0,96       0,94       0,81       0,54   (33,33%)

          Jumlah EFOR Pembangkit Jasa O&M Luar Jawa       28,67       6,16       3,94      18,86   378,68
          Total EFOR of O&M Service Power Plants outside Java


          Sudden Outage Frequency (SdOF)                     Sudden Outage Frequency (SdOF)
          Pembangkit Jasa O&M Luar Jawa                      of O&M Service Power Plants outside Java

          Semakin rendah nilai SdOF maka semakin baik pengelolaan   Lower SdOF rate means better operational management in
          operasional Perusahaan dalam memitigasi gangguan.  mitigating outages.

          Sudden Outage Frequency  (SdOF) pembangkit jasa O&M Luar   The Sudden Outage Frequency (SdOF) of O&M Service power
          Jawa tahun 2022 sebanyak 4,55 kali yaitu meningkat 10,71%   plants outside Java in 2022 was 4.55 times, which was higher by
          dibandingkan tahun 2021. Peningkatan tersebut terutama   10.71% than in 2021. This was due to:
          disebabkan oleh:
          1.  gangguan jaringan eksternal pada sistem penyaluran Berau.  1.  external network interruption in Berau distribution system.
          2.  gangguan kualitas batu bara, kebocoran boiler dan peralatan   2.  declining coal quality, boiler leakage, and mill equipment issue
            mill unit 1-4 di Pangkalan Susu PGU.               in Units 1-4 of Pangkalan Susu PGU.