Page 79 - Annual Report 2022 - PLN Indonesia Power
P. 79
Profil Perusahaan
Company Profile
Riwayat Singkat PLN Indonesia Power
PLN Indonesia Power at a Glance
1996 - 2000 2001 - 2005 2006 - 2010
- Perubahan Nama PT PJB I menjadi Pendirian Anak - Pendirian Anak Perusahaan PT Indo Ridlatama
Indonesia Power (3 Agustus 2000); Perusahaan Power (IRP) (2007);
- Pendirian Anak Perusahaan: PT Indo Pusaka - Pengembangan usaha di bidang penyediaan Jasa
• PT Artha Daya Coalindo (ADC) (1997) Berau (IPB) (2005) Operation & Maintenance (O&M) (2009);
• PT Cogindo Dayabersama (CDB) (1998) Establishment of - Pembentukan UJP (Unit Jasa Pembangkitan)
• PT Rekadaya Elektrika (RE) (2000) Subsidiary PT Indo Banten 2 Labuan (2010).
- Change of name from PT PJB I to Indonesia Power Pusaka Berau (IPB) - Establishment of Subsidiary PT Indo Ridlatama Power
(August 3, 2000); (2005)
(IRP) (2007);
- Establishment of Subsidiaries: - Business development in Operations and Maintenance
• PT Artha Daya Coalindo (ADC) (1997) (O&M) Service provision (2009);
• PT Cogindo DayaBersama (CDB) (1998) - Establishment of Banten 2 Labuan Operations and
• PT Rekadaya Elektrika (RE) (2000)
Maintenance Service Unit (OMU) (2010).
2015 2014 2013
- Pengoperasian PLTDG - Pembentukan UJP Pangkalan - Transformasi menuju Operation and Maintenance (O&M) Exellence;
Pesanggaran 200 MW, Bali; Susu; - Pendirian Anak Perusahaan PT Putra Indotenaga (2013);
- Peletakan batu pertama - Pembentukan UPJP (Unit - Penerapan Indonesia Power-Integrated Management System
pembangunan PLTM Lambur; Pembangkitan dan Jasa (InPower IMS), sinergi standar: ISO 14001, ISO 9001, OHSAS 18001,
- Sertifikasi ISO 55001 dan Pemeliharaan): UPJP Priok, ISO 28001, SMP, SMK3, PAS 55 dan Kriteria Baldrige (2013).
implementasi ISO 26000. UPJP Kamojang, UPJP Bali. - Transformation towards Operation and Maintenance (O&M) Exellence;
- Operation of DGPP Pesanggaran - Establishment of Pangkalan Susu - Establishment of Subsidiary PT Putra Indotenaga (2013);
200 MW, Bali; OMU; - Implementation of Indonesia Power-Integrated Management System (InPower
- Ground Breaking of PLTM Lambur - Establishment of Priok Power IMS), standards for synergy: ISO 14001, ISO 9001, OHSAS 18001, ISO 28001,
construction; Generation and O&M Service SMP, SMK3, PAS 55, and Baldrige criteria (2013)
- ISO 55001 Certification and Units (POMU), Kamojang POMU,
implementation ISO 26000. Bali POMU.
2021 2022
- Sukses mendukung PON XX - Rebranding Perusahaan dari PT Indonesia
PAPUA 2021 dengan Mobile Power menjadi PT PLN Indonesia Power;
Power Plant (MPP) Papua 120 - Menjadi Perusahaan pembangkitan terbesar
MW dan PLTU Holtekamp 24
MW; se-Asia Tenggara dengan Total Kapasitas
- COD PLTU Kalbar 1 2x100 MW; 22,9 GW;
- COD PLTM Gunung Wugul 3 - Pengendalian operasional pembangkit listrik
MW di Jawa Tengah. termal, fokus pada keunggulan operasional dan
- Success in supporting PON XX
PAPUA 2021 with Mobile Power optimalisasi portofolio untuk penyediaan listrik
Plant (MPP) Papua 120 MW and SPP yang resilien dan terjangkau.
Holtekamp 24 MW; - Company Rebranding from PT Indonesia Power to
- Operation of SPP West Kalimantan 1
2x100 MW; PT PLN Indonesia Power;
- Operation of MHPP Gunung Wugul 3 - To be the largest generation company in Southeast
MW in Central Java. Asia with a total capacity of 22.9 GW;
- Operational control of thermal power plants, focus on
operational excellence and portfolio optimization for
the provision of resilient and affordable electricity.
2022 Annual Report
www.plnindonesiapower.co.id 79
PT PLN Indonesia Power