Page 147 - Annual Report 2022 - PLN Indonesia Power
P. 147
Profil Perusahaan
Company Profile
Daftar Anak Perusahaan, Perusahaan Patungan dan Perusahaan Asosiasi
List of Subsidiaries, Joint Ventures, and Associates
Special Purpose Company di Bawah PT Putra Indotenaga
Special Purpose Company under PT Putra Indotenaga
Kepemilikan
Saham PLN
Tanggal Status
Perusahaan Pendirian Operasi Alamat Perusahaan Indonesia Bidang Usaha
No. Power
Company Date of Operation Company Address PLN Indonesia Line of Business
Establishment Status
Power
Shareholding
1. PT Rajamandala 14 Februari Beroperasi Kantor Pusat 51% Pembangkit tenaga listrik
Electric Power 2012 In operation Head Office melalui melalui pengoperasian PLTA
February 14, Wisma PMI Lt.2 Suite 202 PT Putra Rajamandala 1x47 MW (COD
2012 Jalan Wijaya I No. 63 Indotenaga sejak 12 Mei 2019)
Kebayoran Baru through Power plant through
Jakarta Selatan 12170 PT Putra operation of HPP
(62 21) 726 5145 Indotenaga Rajamandala with capacity
(62 21) 727 9370 of 1x47 MW (COD since May
ENVE admin@rajamandala-power.com 12, 2019)
www.rajamandala-power.com
Kantor Pembangkit
Power Generation Office
PLTA HPP Rajamandala
Jl. PLTA Rajamandala,
Kp. Bantarcaringin, Desa Cihea,
RT 4 RW 10, Kecamatan Haurwangi,
Kabupaten Cianjur
Provinsi Jawa Barat – 43283
2. PT GCL 25 Februari Beroperasi Kantor Pusat 35% Didirikan khusus untuk
Indotenaga 2016 In operation Head Office melalui mengembangkan,
February 25, SOHO Capital Building 23 rd PT Putra mengoperasikan, dan
2016 Floor Unit 05 Indotenaga memelihara PLTU Kalbar-1
Jl. Letjend. S. Parman Kav 28 through 2x100 MW
Jakarta Barat PT Putra Specially established
(62 21) 3003 3370 Indotenaga to develop, operate,
and maintain SPP West
Kantor Pembangkit Kalimantan-1 2x100 MW
Power Generation Office
PLTU SPP Kalbar-1
Dusun Tanjung Gundul,
Desa Karimunting,
Kec. Sungai Raya Kepulauan,
Kab. Bengkayang
Provinsi Kalimantan Barat
3. PT Suralaya Indo 15 November Beroperasi Jl. Jend Gatot Subroto 99,99% Intermediate company dalam
Tenaga 2019 In operation Kav. 18, Lt. 2 melalui rangka pengembangan PLTU
November 15, Jakarta Selatan PT Putra Jawa 9-10 kapasitas 2x1000
2019 (62 21) 526 7666 Indotenaga MW
through Intermediate company in the
PT Putra framework of SPP Java 9-10
Indotenaga development with capacity of
2x1000 MW
4. PT Putra Suralaya 15 November Beroperasi Jl. Jend Gatot Subroto 99,99% Intermediate company dalam
Indotenaga 2019 In operation Kav. 18, Lt. 2 melalui rangka pengembangan PLTU
November 15, Jakarta Selatan PT Putra Intermediate company in the
2019 (62 21) 526 7666 Indotenaga framework of SPP
through
PT Putra
Indotenaga
2022 Annual Report
www.plnindonesiapower.co.id 147
PT PLN Indonesia Power